|
|
|||||
|
There is a door to reception and the Crump Room at the south end The plywood on the ground covers the intakes to the heating and ventilation plant below Roof and surface run-off are connected to the white pipe |
|
![]() |
|||
|
© Christ Church/Geoff Williams |
14_32261.JPG
|
||||